Enabling, Demolition & Remediation

Through strategic alliances with partnering specialist organisations; Hovington offer a single point responsibility solution to clients’ needs for developing Brownfield & existing sites. Producing substantial programme benefits through resource and package optimisation and also providing infrastructure solutions for Greenfield sites.

Featured Enabling, Demolition & Remediation Projects

Universal-Containers-projsummary

UCS Production & Container Storage Facility

Remediation of an existing brownfield site to construct a new Head Office Building with associated Car Parking, Container Production Facilities, Bulk Shipping Container Storage and associated logistics, security & service provision for all on site operations.
ikea-projsummary

Ikea Store Sheffield

Remediation of an existing former heavy industrial site to provide the enabling works package for a new Ikea Superstore under a design & build contract. Works comprised the demolition & remediation of the existing buildings, bulk earthworks to re-profile the site, dealing with unforeseen subterranean ground conditions, processing of site won material to achieve BREEAM excellent rating, construction of reinforced concrete retaining structures & surface car parking together with all associated drainage & incoming statutory service provision.
Gallery 15

Asda Walmart, Keighley – new build store

Following the demolition of an existing mill complex, we then undertook the enabling & remediation of the existing site including bulk earthworks & filling operations, groundworks on the new store construction & a complex S278 Highways package which comprised extensive off site highway works to upgrade the local infrastructure to accommodate the new store.
tsl-logo

Lidl Regional Distribution Centre, Runcorn

The project encompassed the extension & remodelling of the existing regional distribution facility which was operational throughout the duration of the contract. Our works comprised demolition, bulk earthworks, groundworks, extensive external & concrete works in a live depot environment.
safestore-logo

Safestore Self-Storage Warehouse, Birmingham

Following the demolition of the existing foundry building on the site, we undertook the bulk earthworks, groundworks & adoptable highway works on this new build self-storage warehouse under a Construction Management contractual arrangement with the client.
airbus-logo

Waste Recycling & Management Facility & Costa Coffee, Airbus Operations Ltd

The construction of a new waste handling facility and office in an environmentally challenging location. Including provision and maintenance of all temporary waste handling staff and plant. And the civils requirements associated with the provision of a new Costa Coffee outlet.
sainsburys-logo

Sainsbury’s Store at Leek

This new build retail park constructed on a brown field site involved the remediation of a vast area of contaminated ground, new carriageway configuration a river diversion and associated structures plus the installation of a new drainage scheme including settlement ponds and overflow system. All of the new units required bespoke drainage and service installations with each end user having specific completion dates.
hopwood-hall-logo

Hopwood Hall College, Rochdale

Following the demolition of an existing college building on the site, we were appointed as Principal Contractor to construct a new car park inclusive of lighting, CCTV security with ANVR, security fencing to the perimeter and security barrier system when entering/exiting the car park.
sainsburys-logo

Sainsburys Store Extension, Halifax

Extension & remodelling of an existing live superstore, located in a high profile town centre on the sides of a steep valley with suspended slab construction to suit the topography of the site & space at a premium. The store remained open throughout the main construction phase, with a stipulation to maintain 90% of all parking throughout the project.
bowmer-and-kirkland-logo

Sainsbury’s Store Reconstruction, Nantwich

Comprised the off-line construction of a new 80,000 sq feet sales area superstore on the site of an existing live store that remained open throughout the main construction phase and adjacent land acquired by the client, with phased demolition of the existing store & reconfiguration of the new car parking for the final scheme
bowmer-and-kirkland-logo

Sainsburys Store Extension, Shorehead, Huddersfield

Extension & remodelling of an existing live superstore, in a high profile town centre location. The store remained open throughout the main construction phase, with a stipulation to optimise parking provision & minimise customer disruption throughout the project.
Simons logo

MSDP Redevelopment, Liverpool

This project showcased the full range of Hovington’s capabilities taking the scheme from initial demolition of the existing former school building to the site remediation & enabling works package and then continuing with the full groundworks package for the new build Aldi, M&S Food Hall and the new Merseyside Society for Deaf People Headquarters Building.

Want to discuss your requirements?

Our team of highly trained profesionals are on hand to answer any questions you might have about your anchor=bottomright requirements.
Call us today on 01706 354 502 or send us a message using our online contact form