Search Result

Search

MSDP Redevelopment, Liverpool

This project showcased the full range of Hovington’s capabilities taking the scheme from initial demolition of the existing former school building to the site remediation & enabling works package and then continuing with the full groundworks package for the new build Aldi, M&S Food Hall and the new Merseyside Society for Deaf People Headquarters Building.

Sainsburys Store Extension, Shorehead, Huddersfield

Extension & remodelling of an existing live superstore, in a high profile town centre location. The store remained open throughout the main construction phase, with a stipulation to optimise parking provision & minimise customer disruption throughout the project.

Sainsbury’s Store Reconstruction, Nantwich

Comprised the off-line construction of a new 80,000 sq feet sales area superstore on the site of an existing live store that remained open throughout the main construction phase and adjacent land acquired by the client, with phased demolition of the existing store & reconfiguration of the new car parking for the final scheme

Sainsburys Store Extension, Halifax

Extension & remodelling of an existing live superstore, located in a high profile town centre on the sides of a steep valley with suspended slab construction to suit the topography of the site & space at a premium. The store remained open throughout the main construction phase, with a stipulation to maintain 90% of all parking throughout the project.

Sainsbury’s Store at Leek

This new build retail park constructed on a brown field site involved the remediation of a vast area of contaminated ground, new carriageway configuration a river diversion and associated structures plus the installation of a new drainage scheme including settlement ponds and overflow system. All of the new units required bespoke drainage and service installations with each end user having specific completion dates.

Asda Walmart, Keighley – new build store

Following the demolition of an existing mill complex, we then undertook the enabling & remediation of the existing site including bulk earthworks & filling operations, groundworks on the new store construction & a complex S278 Highways package which comprised extensive off site highway works to upgrade the local infrastructure to accommodate the new store.

Alban Retail Park, Warrington

Major alterations to widen the A49 Winwick Road, Warrington. The works included the construction of an additional right turn lane and formation of a new automated junction to the existing retail park.

Ikea Store Sheffield

Remediation of an existing former heavy industrial site to provide the enabling works package for a new Ikea Superstore under a design & build contract. Works comprised the demolition & remediation of the existing buildings, bulk earthworks to re-profile the site, dealing with unforeseen subterranean ground conditions, processing of site won material to achieve BREEAM excellent rating, construction of reinforced concrete retaining structures & surface car parking together with all associated drainage & incoming statutory service provision.